Drawing of Record Submitted |
|
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/14/2003 Correction Required per Jeff Lance. Need W marked in c urb on all lots. Straighten fire hydrant to street. Clean concrete out of box on lot 78. Valves need arrows and 4" line needs to e marked 4" in concrete. Turn meter box lids to street.
10/22/2003. Approved Per Kevin Condie - very good job - thank you. |
Wastewater |
10/14/2003 Correction Required per Jeff Lance. Need W marked in c urb on all lots. Straighten fire hydrant to street. Clean concrete out of box on lot 78. Valves need arrows and 4" line needs to e marked 4" in concrete. Turn meter box lids to street.
10/22/2003. Approved Per Kevin Condie - very good job - thank you. |
Engineering |
10/14/2003 APPROVED per Mike Hester. |
City Development Engineer |
10/14/2003 Approved per Judd. |
Landscaping |
10/15/2003. Approved per Lynne Scott -- no street trees required as this phase has no frontage on 1450 S per Russ Jenson. |
| |
General Comments: |
|