| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/14/2003 Correction Required per Jeff Lance. Need W marked in c urb on all lots. Straighten fire hydrant to street. Clean concrete out of box on lot 78. Valves need arrows and 4" line needs to e marked 4" in concrete. Turn meter box lids to street. 10/22/2003. Approved Per Kevin Condie - very good job - thank you. |
| Wastewater | 10/14/2003 Correction Required per Jeff Lance. Need W marked in c urb on all lots. Straighten fire hydrant to street. Clean concrete out of box on lot 78. Valves need arrows and 4" line needs to e marked 4" in concrete. Turn meter box lids to street. 10/22/2003. Approved Per Kevin Condie - very good job - thank you. |
| Engineering | 10/14/2003 APPROVED per Mike Hester. |
| City Development Engineer | 10/14/2003 Approved per Judd. |
| Landscaping | 10/15/2003. Approved per Lynne Scott -- no street trees required as this phase has no frontage on 1450 S per Russ Jenson. |
| General Comments: | |