| Drawing of Record Submitted | 11/21/2014 |
|---|---|
| Electronic Drawing | 11/21/2014 |
| Final Grading Report | 11/21/2014 |
| Date Scheduled | 11/24/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 11/24/2014 Approved per Trent Bowler 3/3/2016 Approved 1 yr warranty per Kevin Condie |
| Wastewater | 11/24/2014 Approved per Trent Bowler 3/3/2016 Approved 1 yr warranty per Kevin Condie |
| Engineering | 11/26/2014 Corrections required per Brandon Wright.. Stop signs & street cords not installed 12/15/2014 Approved per Brandon Wright 03/11/2016 Approved 1 year warranty per Brandon Wright. |
| City Development Engineer | 11/25/2014 Streets Dept Only..School ahead sign needs to be in sidewalk at leading edge of school stencil. stop sign @ crimson Ridge & little Valley needs reinstalled with base at proper height. Need stop sign with street coords at on 2505 E at Crimson Ridge, Need stop sign with street coords on 3490 So at little Valley Rd. Need street coords on inside corner of 2505 E & 3490 So 12/18/2014 Corrections required per Streets Dept John Graves.. School ahead sign needs to be relocated into sidewalk concrete at the leading edge of the painted school stencil 1/14/2015 Approved Per Streets Dept John Graves |
| Landscaping | 11/25/2014 Approved per John Willis 2/18/2015 Approved per Craig Harvey |
| General Comments: | |
| 10% Warranty recvd..2/11/2015 | |