Drawing of Record Submitted |
11/20/2014/ 8/20/2015 |
Electronic Drawing |
11/20/2014/ 08/20/2015 |
Final Grading Report |
11/21/2014/ 8/20/2015 |
Date Scheduled |
11/25/2014/ 8/20/2015 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
8/24/2015 Approved Per Bryce Mitchell |
Water |
11/26/2014 Approved per Carson Tait
8/28/2015 Corrections required: Need to uncover and collar hydrant valve. Need to put line sizes and direction of flow arrows into collars. Rotate steamer nozzle to face the street.
9/3/2015 Approved per Carson Tait |
Wastewater |
11/26/2014 Approved per Carson Tait
8/28/2015 Corrections required: Need to uncover and collar hydrant valve. Need to put line sizes and direction of flow arrows into collars. Rotate steamer nozzle to face the street.
9/3/2015 Approved per Carson Tait |
Engineering |
11/26/2014 Corrections required per Brandon Wright..parking stall are not marked no handicap stalls, curb on inside is not per plan missing A curb at round about entrance both sides missing asphalt on world mark dr, missing stop signs and directional arrows no side walk installed on inside
8/25/2015 Approved per Brandon Wright |
City Development Engineer |
12/02/2012 Streets Dept Only.. Corrections required Per Jared Stewart Streets Dept only.. Need stop signs on Driveway entering public street inlet box #10 needs wafer board removed Inlet box #6 needs erosin sock removed from inside the box |
Landscaping |
11/25/2014 Corrections required per John Willis Not Ready.. No landscaping yet
9/9/2015 Approved per Wes Jenkins |
| |