| Drawing of Record Submitted | 2/13/2015 |
|---|---|
| Electronic Drawing | 2/13/2015 |
| Final Grading Report | 2/13/2015 |
| Date Scheduled | 2/17/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 2/18/2015 Approved per Kevin Condie 03/21/2016 Approved 1 yr warranty per Kevin Condie |
| Wastewater | 2/18/2015 Approved per Kevin Condie 03/21/2016 Approved 1 yr warranty per Kevin Condie |
| Engineering | 2/18/2015 Approved per Brandon Wright 3/9/2016 Approved 1 year warranty per Brandon Wright |
| City Development Engineer | |
| Landscaping | 4/01/2015 Corrections per Craig Harvey See Attached field inspection report dated 3/30/15.. See Approved Landscape & Irrigation plans dated 2/18/14 attached a copy 4/23/2015 Corrections required Per Craig Harvey.. Need to rake the chat mulch and add additional mulch in some areas where it appears thin still short 5 live oaks as shown on plan, Fence installer needs to clean up concrete debris & construction waste off the landscape strip along the blockwall 5/19/15 - approved per Craig Harvey |
| General Comments: | |
| 2/19/15 received completion and warranty bond (GS) | |