[Oakwood]
Number: Grading-47187

Drawing of Record Submitted 2/13/2015
Electronic Drawing 2/13/2015
Final Grading Report 2/13/2015
Date Scheduled 2/17/2015
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 2/18/2015 Approved per Kevin Condie 03/21/2016 Approved 1 yr warranty per Kevin Condie
Wastewater 2/18/2015 Approved per Kevin Condie 03/21/2016 Approved 1 yr warranty per Kevin Condie
Engineering 2/18/2015 Approved per Brandon Wright 3/9/2016 Approved 1 year warranty per Brandon Wright
City Development Engineer
Landscaping 4/01/2015 Corrections per Craig Harvey See Attached field inspection report dated 3/30/15.. See Approved Landscape & Irrigation plans dated 2/18/14 attached a copy 4/23/2015 Corrections required Per Craig Harvey.. Need to rake the chat mulch and add additional mulch in some areas where it appears thin still short 5 live oaks as shown on plan, Fence installer needs to clean up concrete debris & construction waste off the landscape strip along the blockwall 5/19/15 - approved per Craig Harvey
    
General Comments:
2/19/15 received completion and warranty bond (GS)