| Drawing of Record Submitted | 6/23/2015 |
|---|---|
| Electronic Drawing | 6/22/2015 |
| Final Grading Report | 6/03/2015 |
| Date Scheduled | 6/24/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 6/26/2015 Corrections required per Kevin Condie.. Lot #8 meter setter needs to be centered in box, Lot #4 meter boxing is broken replace meter setters need to be 9-12" down from lids |
| Wastewater | 6/26/2015 Corrections required per Kevin Condie.. Lot #8 meter setter needs to be centered in box, Lot #4 meter boxing is broken replace meter setters need to be 9-12" down from lids |
| Engineering | 6/29/2015 Approved per Brandon Wright 7/22/2016 approved per Tom Cullison |
| City Development Engineer | |
| Landscaping | 6/23/2015 Corrections required per Wes Jenkins: Need public improvement once your warranty bond |
| General Comments: | |