| Drawing of Record Submitted | 5/19/2015 |
|---|---|
| Electronic Drawing | 5/19/2015 |
| Final Grading Report | |
| Date Scheduled | 5/20/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | Approved |
| Water | To be COMPLETED Prior to CO being issued for second building. Per Wes Jenkins 5/21/15 Need concrete pads around hydrants, meter boxes and valve collars. Need backflow assembly tested and tagged |
| Wastewater | To be COMPLETED Prior to CO being issued for second building. Per Wes Jenkins 5/21/15 Need concrete pads around hydrants, meter boxes and valve collars. Need backflow assembly tested and tagged |
| Engineering | To be COMPLETED Prior to CO being issued for second building. Per Wes Jenkins 5/21/15 Missing side walk drainage structure. Missing handicap sign. Missing trash enclosure. No Landscape. Missing Final Grading report.Patch 1100 E along gutter. 8/27/2015 Approved per Wes Jenkins/Brandon Wright |
| City Development Engineer | |
| Landscaping | To be COMPLETED Prior to CO being issued for second building. Per Wes Jenkins 5/21/15 Need to finish Landscape 8/27//2015 Approved per Wes Jenkins/Brandon Wright |
| General Comments: | |