| Drawing of Record Submitted | 2/18/2015 |
|---|---|
| Electronic Drawing | 2/18/2015 |
| Final Grading Report | 2/18/2015 |
| Date Scheduled | 2/19/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 2/23/2015 Corrections required per Kevin Condie..Protect hydrant from getting hit break concrete from lids & collars lines sizes and arrow in collars 3/13/2015 Approved per Carson Tait 03/21/2016 Approved 1 yr warranty per Kevin Condie |
| Wastewater | 2/23/2015 Corrections required per Kevin Condie..Protect hydrant from getting hit break concrete from lids & collars lines sizes and arrow in collars 3/13/2015 Approved per Carson Tait 03/21/2016 Approved 1 yr warranty per Kevin Condie |
| Engineering | 2/19/2015 Corrections required per Brandon Wright.. gates on trash enclosure not installed, stop sign missing Not on plans 3/12/2015 Approved per Brandon Wright 3/14/2016 Approved warranty per Brandon Wright |
| City Development Engineer | |
| Landscaping | 2/20/2015 Approved per Wes Jenkins |
| General Comments: | |
| Need 10% Warranty Bond received bond 3/2/15 (GS) | |