| Drawing of Record Submitted | 11/19/2014 |
|---|---|
| Electronic Drawing | 11/19/2014 |
| Final Grading Report | 11/19/2014 |
| Date Scheduled | 11/20/2014 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 12/02/2014 Approved per Kevin Condie 11/09/2015 Approved 1 yr warranty per Kevin Condie |
| Wastewater | 12/02/2014 Approved per Kevin Condie 11/09/2015 Approved 1 yr warranty per Kevin Condie |
| Engineering | 11/20/2014 Corrections required per Brandon Wright Concrete not finished not ready for final 12/04/2014 Approved per Brandon Wright 11/10/2015 Approved 1 yr warranty per Brandon Wright |
| City Development Engineer | 11/25/2014 Corrections required per Jared Stewart Streets Dept Only.. Streets Dept .. Sign base @ Church Rocks Cir and Cairn Way is low, sign base @ rim runner Dr & Church missing street coords @ Prospector Way and Church Rocks Dr Need street coord for Church Rocks Drive all intersection with Cairn way 12/03/2014 Corrections required Per Joh Graves Per John Graves.. Streets Dept Only Sign base @ Church Rocks Circle and cairn way is low need street coord sign @ intersection of Church Rocks Dr and Charin Way for Church Rocks Dr 12/04/2014 Approved per Streets Dept Per Dave |
| Landscaping | 11/21/2014 Corrections required per John Willis.. No landscaping on double fronting lots 12/04/2014 Quality Bonded for Landscape 12/2/15 improvement bond inspection failed. landscaping as shown on ph 2 plat is not complete |
| General Comments: | |