| Drawing of Record Submitted | 6/16/15/Revised 6/18/15/6/24/15 |
|---|---|
| Electronic Drawing | 6/16/15/Revised 6/18/15/6/24/15 |
| Final Grading Report | 6/16/15 |
| Date Scheduled | 6/17/15 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 6/19/2015 Corrections required Per Kevin Condie..Need to fill & flush line, @ intersection of Desert Canyon & desert Crest stub going south if they are not going to us it needs to be Guardrail @ Desert Canyon & Rim Runner need to see if I can get valve wrench on valve can't are not straight need a valve extension 6/25/2015 Approved per Kevin Condie..Note Per Phone 3/1/2016 Approved 1 year warranty per Kevin Condie |
| Wastewater | 6/19/2015 Corrections required Per Kevin Condie..Need to fill & flush line, @ intersection of Desert Canyon & desert Crest stub going south if they are not going to us it needs to be Guardrail @ Desert Canyon & Rim Runner need to see if I can get valve wrench on valve can't are not straight need a valve extension 6/25/2015 Approved per Kevin Condie..Note Per Phone 3/1/2016 Approved 1 year warranty per Kevin Condie |
| Engineering | 6/18/2015 Approved per Brandon Wright 3/14/2016 Approved 1 year warranty per Brandon Wright. 8/11/2016 1 year impr approved per Tom Cullison |
| City Development Engineer | |
| Landscaping | 6/25/2015 Corrections required: Landscape strip along Desert Canyons Parkway needs to be complete. Needs Bonds. |
| General Comments: | |
| received warranty bond 7/8/2015 (GS) | |