Desert Rim Phase 1
Number: Grading-47676

Drawing of Record Submitted 6/16/15/Revised 6/18/15/6/24/15
Electronic Drawing 6/16/15/Revised 6/18/15/6/24/15
Final Grading Report 6/16/15
Date Scheduled 6/17/15
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 6/19/2015 Corrections required Per Kevin Condie..Need to fill & flush line, @ intersection of Desert Canyon & desert Crest stub going south if they are not going to us it needs to be Guardrail @ Desert Canyon & Rim Runner need to see if I can get valve wrench on valve can't are not straight need a valve extension 6/25/2015 Approved per Kevin Condie..Note Per Phone 3/1/2016 Approved 1 year warranty per Kevin Condie
Wastewater 6/19/2015 Corrections required Per Kevin Condie..Need to fill & flush line, @ intersection of Desert Canyon & desert Crest stub going south if they are not going to us it needs to be Guardrail @ Desert Canyon & Rim Runner need to see if I can get valve wrench on valve can't are not straight need a valve extension 6/25/2015 Approved per Kevin Condie..Note Per Phone 3/1/2016 Approved 1 year warranty per Kevin Condie
Engineering 6/18/2015 Approved per Brandon Wright 3/14/2016 Approved 1 year warranty per Brandon Wright. 8/11/2016 1 year impr approved per Tom Cullison
City Development Engineer
Landscaping 6/25/2015 Corrections required: Landscape strip along Desert Canyons Parkway needs to be complete. Needs Bonds.
    
General Comments:
received warranty bond 7/8/2015 (GS)