| Drawing of Record Submitted | 4/10/15 revised 4/14/2015 |
|---|---|
| Electronic Drawing | 4/10/2015 revised 4/14/2015 |
| Final Grading Report | 04/08/2015 |
| Date Scheduled | 4/13/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 4/13/2015 Approved per Kevin Condie..Note: Need As Builts.. 1st inspection.. 1. Paint the bottom on all hydrants, grind the W's on curbs not used Open all valves, Redo as builts to show angle to hydrants & phase line valves replace stem on valve coming into project 3/2/2016 Approved 1 year warranty per Kevin Condie |
| Wastewater | 4/13/2015 Approved per Kevin Condie..Note: Need As Builts.. 1st inspection.. 1. Paint the bottom on all hydrants, grind the W's on curbs not used Open all valves, Redo as builts to show angle to hydrants & phase line valves replace stem on valve coming into project 3/2/2016 Approved 1 year warranty per Kevin Condie |
| Engineering | 4/14/2015 Approved Brandon Wright 3/10/2016 Approved 1 year warranty per Brandon Wright |
| City Development Engineer | |
| Landscaping | 4/13/2015 Approved Per Craig Harvey .. Note: valve boxes are full of water there is probably a leak in laterals |
| General Comments: | |