Drawing of Record Submitted |
4/10/15 revised 4/14/2015 |
Electronic Drawing |
4/10/2015 revised 4/14/2015 |
Final Grading Report |
04/08/2015 |
Date Scheduled |
4/13/2015 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/13/2015 Approved per Kevin Condie..Note: Need As Builts.. 1st inspection.. 1. Paint the bottom on all hydrants, grind the W's on curbs not used Open all valves, Redo as builts to show angle to hydrants & phase line valves replace stem on valve coming into project
3/2/2016 Approved 1 year warranty per Kevin Condie |
Wastewater |
4/13/2015 Approved per Kevin Condie..Note: Need As Builts.. 1st inspection.. 1. Paint the bottom on all hydrants, grind the W's on curbs not used Open all valves, Redo as builts to show angle to hydrants & phase line valves replace stem on valve coming into project
3/2/2016 Approved 1 year warranty per Kevin Condie |
Engineering |
4/14/2015 Approved Brandon Wright
3/10/2016 Approved 1 year warranty per Brandon Wright |
City Development Engineer |
|
Landscaping |
4/13/2015 Approved Per Craig Harvey .. Note: valve boxes are full of water there is probably a leak in laterals |
| |
General Comments: |
|