[Sage Meadows Phase 3]
Number: Grading-47770

Drawing of Record Submitted 4/10/15 revised 4/14/2015
Electronic Drawing 4/10/2015 revised 4/14/2015
Final Grading Report 04/08/2015
Date Scheduled 4/13/2015
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 4/13/2015 Approved per Kevin Condie..Note: Need As Builts.. 1st inspection.. 1. Paint the bottom on all hydrants, grind the W's on curbs not used Open all valves, Redo as builts to show angle to hydrants & phase line valves replace stem on valve coming into project 3/2/2016 Approved 1 year warranty per Kevin Condie
Wastewater 4/13/2015 Approved per Kevin Condie..Note: Need As Builts.. 1st inspection.. 1. Paint the bottom on all hydrants, grind the W's on curbs not used Open all valves, Redo as builts to show angle to hydrants & phase line valves replace stem on valve coming into project 3/2/2016 Approved 1 year warranty per Kevin Condie
Engineering 4/14/2015 Approved Brandon Wright 3/10/2016 Approved 1 year warranty per Brandon Wright
City Development Engineer
Landscaping 4/13/2015 Approved Per Craig Harvey .. Note: valve boxes are full of water there is probably a leak in laterals
    
General Comments: