Drawing of Record Submitted |
1/6/2015 |
Electronic Drawing |
1/6/2015 |
Final Grading Report |
|
Date Scheduled |
12/29/2014 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/28/2014 Corrections required per Kevin Condie.. Line Size and arrows in valve collar remove tape off of hydrant
1/12/2015 Approved per Kevin Condie |
Wastewater |
12/28/2014 Corrections required per Kevin Condie.. Line Size and arrows in valve collar remove tape off of hydrant
1/12/2015 Approved per Kevin Condie |
Engineering |
12/29/2014 Approved Per Brandon Wright.. Note: Site is not per Eng stamped plan on private side some changes have been made to site per Contractor & Owner |
City Development Engineer |
|
Landscaping |
12/26/2014 Approved per John Willis |
| |
General Comments: |
|