Drawing of Record Submitted |
01/06/2016 |
Electronic Drawing |
01/06/2016 |
Final Grading Report |
01/06/2016 |
Date Scheduled |
01/07/2016 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
01/11/2016 Corrections required:
1) Waiting for (2) Backflow tests
01/13/2016 Corrections required:
1) Need to have the backflow assembly on the fire riser tested and tagged.
2) Need the backflow assembly in the meter pit tested and tagged.
3) Need the curb painted red and the fire hydrant at the northwest corner of the parking lot.
01/19/2016 Approved per Carson Tait |
Wastewater |
01/11/2016 Corrections required:
1) Waiting for (2) Backflow tests
01/13/2016 Corrections required:
1) Need to have the backflow assembly on the fire riser tested and tagged.
2) Need the backflow assembly in the meter pit tested and tagged.
3) Need the curb painted red and the fire hydrant at the northwest corner of the parking lot.
01/19/2016 Approved per Carson Tait |
Engineering |
01/11/2016 Corrections required 1) Site is not cleaned up for final 2) Adjacent property needs to be cleaned up 3) Trash enclosure gates not hung. per Brandon Wright
01/13/2016 Approved per Brandon Wright |
City Development Engineer |
|
Landscaping |
01/07/2016 Corrections required 1) Landscape at rear of building not
complete
2) Streetscape is finished
3)Construction trash Debris needs
to be removed and cleaned off of all
landscaped areas - including
streetscape
per Craig Harvey
1/19/2016 Approved per Craig Harvey |
| |
General Comments: |
|