Drawing of Record Submitted |
8/7/2015 |
Electronic Drawing |
8/07/2015 |
Final Grading Report |
8/10/2015 |
Date Scheduled |
8/12/2015 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
8/14/2015 Approved per Bryce Mitchell |
Water |
8/12/2015 Corrections required per Carson Tait..The recorded plat for lots 25,26,27,28,35, and 36 must to have the note about service to be constructed as part of home approval with Building permit. |
Wastewater |
8/12/2015 Corrections required per Carson Tait..The recorded plat for lots 25,26,27,28,35, and 36 must to have the note about service to be constructed as part of home approval with Building permit. |
Engineering |
8/12/2015 Corrections required per Brandon Wright No streets cords in place, clean Di boxes, monuments for survey? Note: in Final grading report 2 failing test on service at pipe zone not re tested Type 2 aggregate is not on City approved site.
8/18/2015 Approved Per Brandon Wright Eng Dept.. Note: NO PERMITS for Building until Street Signs and Cords are in place |
City Development Engineer |
8/18/20158 Approved per Wes Jenkins |
Landscaping |
8/18/2015 Approved per Wes Jenkins |
| |
General Comments: |
|