| Drawing of Record Submitted | 6/26/2015 |
|---|---|
| Electronic Drawing | 6/26/2015 |
| Final Grading Report | 6/29/2015 |
| Date Scheduled | 6/30/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 06/30/2015 per Carson Tait. Corrections required: Need Bingham and Taylor lids on all water valves. Two of the lids do not meet the city specs. 8/03/2015 Approved per Carson Tait 4/14/2016 Approved 1 year warranty per Carson Tait |
| Wastewater | 06/30/2015 per Carson Tait. Corrections required: Need Bingham and Taylor lids on all water valves. Two of the lids do not meet the city specs. 8/03/2015 Approved per Carson Tait 4/14/2016 Approved 1 year warranty per Carson Tait |
| Engineering | 6/30/2015 Approved per Brandon Wright 3/11/2016 Approved 1 year warranty per Brandon Wright |
| City Development Engineer | 7/02/2015 Corrections Required Per Wes Jenkins Need warranty Bond |
| Landscaping | 7/02/2015 Corrections Required Per Wes Jenkins Need warranty Bond |
| General Comments: | |