Aspen Estates Phase 1
Number: Grading-48141

Drawing of Record Submitted 10/13/2015
Electronic Drawing 10/13/2015
Final Grading Report 10/13/2015
Date Scheduled 10/15/2015
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 10/19/2015 Corrections required: Not Ready per Kevin Condie 11/17/2015 Approved per Kevin Condie
Wastewater 10/19/2015 Corrections required: Not Ready per Kevin Condie 11/17/2015 Approved per Kevin Condie
Engineering 10/15/2015 Corrections required: Sidewalk is not complete and survey on corners is not complete. per Brandon Wright 11/16/2015 Approved per Brandon Wright
City Development Engineer
Landscaping 10/22/2015 Corrections required: Landscape not installed MUST inspect irrigation lines prior to covering. MUST be called before installation begins of landscape 11/16/2015 Approved per Craig Harvey
    