| Drawing of Record Submitted | 10/13/2015 |
|---|---|
| Electronic Drawing | 10/13/2015 |
| Final Grading Report | 10/13/2015 |
| Date Scheduled | 10/15/2015 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 10/19/2015 Corrections required: Not Ready per Kevin Condie 11/17/2015 Approved per Kevin Condie |
| Wastewater | 10/19/2015 Corrections required: Not Ready per Kevin Condie 11/17/2015 Approved per Kevin Condie |
| Engineering | 10/15/2015 Corrections required: Sidewalk is not complete and survey on corners is not complete. per Brandon Wright 11/16/2015 Approved per Brandon Wright |
| City Development Engineer | |
| Landscaping | 10/22/2015 Corrections required: Landscape not installed MUST inspect irrigation lines prior to covering. MUST be called before installation begins of landscape 11/16/2015 Approved per Craig Harvey |
| General Comments: | |