Drawing of Record Submitted |
10/02/2015 |
Electronic Drawing |
10/02/2015 |
Final Grading Report |
10/05/2015 |
Date Scheduled |
10/05/2015 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
10/5/2015 - Corrections required: Need to pour a concrete collar around the meter box with rebar in the ends of the meter box extending into the pad, need hose bib vacuum breaker on the hose bib. as per Carson Tait |
Wastewater |
10/5/2015 - Corrections required: Need to pour a concrete collar around the meter box with rebar in the ends of the meter box extending into the pad, need hose bib vacuum breaker on the hose bib. as per Carson Tait |
Engineering |
10/6/2015 Approved per Clint Hafen |
City Development Engineer |
|
Landscaping |
|
| |
General Comments: |
|