| Drawing of Record Submitted | 05/25/2016 |
|---|---|
| Electronic Drawing | 05/25/2016 |
| Final Grading Report | 06/15/2016 |
| Date Scheduled | 06/16/2016 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | No required |
| Water | 06/16/2016 Corrections required: Need contractor to open all valves but not the phase line valves, remove tape off hydrants and paint them to the top of the concrete, need to check locate wire, need to clean meter boxes so you can get on the customers valve. per Kevin Condie 07/06/2016 Approved per Kevin Condie |
| Wastewater | 06/16/2016 Corrections required: Need contractor to open all valves but not the phase line valves, remove tape off hydrants and paint them to the top of the concrete, need to check locate wire, need to clean meter boxes so you can get on the customers valve. per Kevin Condie 07/06/2016 Approved per Kevin Condie |
| Engineering | 06/16/2016 Correction requested: Need rock wall design, concrete curb cracks need to be fixed monuments need to be stamped per Tom Cullison 07/15/2016 Approved per Tom Cullison |
| City Development Engineer | |
| Landscaping | |
| General Comments: | |