Drawing of Record Submitted |
03/25/2005 |
Electronic Drawing |
03/25/2005 |
Final Grading Report |
03/25/2005 |
Date Scheduled |
03/31/2005..Plat Recorded 03/22/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
04/04/2005 Corrections required per Dennis Wright.. Not Ready
05/24/2005 Approved per Dennis Wright
05/15/2006 Approved per Dennis Wright for 1 yer warranty. |
Water |
04/19/2005 Approved per Kevin Condie
05/19/2006 Approved per Kevin Condie for 1 year warranty. |
Wastewater |
04/19/2005 Approved per Kevin Condie
05/19/2006 Approved per Kevin Condie for 1 year warranty. |
Engineering |
03/31/2005 Corrections Required per Larry Henderson. Replace broken curb on Artesia and on Snow Canyon Pkyway. ramp sidewalk ends-backfill curb on Snow Canyon pkway,Install monuments-install street lights,reset lot corners-development and wall certs. remove spilled concrete.clean out inlet boxes,clean dirt off of curb on Snow Canyon pkway, seal cracked curb, redo patches on Snow Canyon pkway. remove construction signs,trim expansion joints,pick up trash.
04/22/2005 Correction required per Larry Henderson.. Stop sign too low to be 7' from back of wall, replace 2 curb sections
04/29/2005 Approved Per Larry Henderson |
City Development Engineer |
04/06/2005 Corrections required per Jay Sandberg.. Need final plat recorded.. need wall certifications from AGEC. Need wall Drawing of record.Need "Stop Ahead " 100 ft before stop.End at road markers 2 @ 7 mounting height. Need agreement with parks signed on landscaping.. Need inprovements on SCP completed or "paved".
04/27/2005 Corrections required per Jay Sandberg.. Need set back recommendation in Geotech certification. Need to discuss over lay on Snow Canyon Parkway.
6/2/05 Approved - Jay Sandberg |
Landscaping |
04/01/2005 Corrections required per Doug W. No Trees.
04/25/2005 Approved per Doug W. |
| |
General Comments: |
11/21/03 Hillside Development Permit approved by CC on ?. Waiting on Construction Drawings approval. Road width is being considered whether 45' or 50'. Restoration Bond will be required and grading permit will be required. Development is located North of Snow Canyon Parkway West of Paradise Canyon. |