[Augustus Pointe Subdivision]
Number: Grading-30999

Drawing of Record Submitted 03/25/2005
Electronic Drawing 03/25/2005
Final Grading Report 03/25/2005
Date Scheduled 03/31/2005..Plat Recorded 03/22/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 04/04/2005 Corrections required per Dennis Wright.. Not Ready 05/24/2005 Approved per Dennis Wright 05/15/2006 Approved per Dennis Wright for 1 yer warranty.
Water 04/19/2005 Approved per Kevin Condie 05/19/2006 Approved per Kevin Condie for 1 year warranty.
Wastewater 04/19/2005 Approved per Kevin Condie 05/19/2006 Approved per Kevin Condie for 1 year warranty.
Engineering 03/31/2005 Corrections Required per Larry Henderson. Replace broken curb on Artesia and on Snow Canyon Pkyway. ramp sidewalk ends-backfill curb on Snow Canyon pkway,Install monuments-install street lights,reset lot corners-development and wall certs. remove spilled concrete.clean out inlet boxes,clean dirt off of curb on Snow Canyon pkway, seal cracked curb, redo patches on Snow Canyon pkway. remove construction signs,trim expansion joints,pick up trash. 04/22/2005 Correction required per Larry Henderson.. Stop sign too low to be 7' from back of wall, replace 2 curb sections 04/29/2005 Approved Per Larry Henderson
City Development Engineer 04/06/2005 Corrections required per Jay Sandberg.. Need final plat recorded.. need wall certifications from AGEC. Need wall Drawing of record.Need "Stop Ahead " 100 ft before stop.End at road markers 2 @ 7 mounting height. Need agreement with parks signed on landscaping.. Need inprovements on SCP completed or "paved". 04/27/2005 Corrections required per Jay Sandberg.. Need set back recommendation in Geotech certification. Need to discuss over lay on Snow Canyon Parkway. 6/2/05 Approved - Jay Sandberg
Landscaping 04/01/2005 Corrections required per Doug W. No Trees. 04/25/2005 Approved per Doug W.
    
General Comments:
11/21/03 Hillside Development Permit approved by CC on ?. Waiting on Construction Drawings approval. Road width is being considered whether 45' or 50'. Restoration Bond will be required and grading permit will be required. Development is located North of Snow Canyon Parkway West of Paradise Canyon.