Drawing of Record Submitted |
05/04/2016 |
Electronic Drawing |
05/04/2016 |
Final Grading Report |
05/04/2016 |
Date Scheduled |
05/05/2016 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
05/05/2016 Approved per Bryce Mitchell |
Water |
05/10/2016 Corrections required:
Need to cut direction of flow arrows and line sizes into valve collars. Also need to have the backflow assembly on the fire riser tested and tagged per Carson Tait
06/03/2016 Approved per Carson Tait |
Wastewater |
05/10/2016 Corrections required:
Need to cut direction of flow arrows and line sizes into valve collars. Also need to have the backflow assembly on the fire riser tested and tagged per Carson Tait
06/03/2016 Approved per Carson Tait |
Engineering |
05/05/2016 Corrections required:
No parking stall stripping, concrete
approach at street is unfinished,
asphalt @ approach is unfinished,
storm drain box needs to be cleaned per Clint Hafen
06/03/2016 Approved per Clint Hafen |
City Development Engineer |
|
Landscaping |
05/10/2016 Approved per Ray Snyder |
| |
General Comments: |
|