| Drawing of Record Submitted | 01/09/2003 |
|---|---|
| Electronic Drawing | |
| Final Grading Report | 12/16/2003 and additional report received 01/08/2003 |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | 06/23/2003. Corrections required per Judd. Final plat needs to be recorded. |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 01/10/2003 Need to finish first punch ist before calling for reinspection. 01/22/2003 Approved by Kevin Condie |
| Wastewater | 01/10/2003 Need to finish first punch ist before calling for reinspection. 01/22/2003 Approved by Kevin Condie |
| Engineering | 01/16/2003 Corrections required. Punch list items not completed. Larry Henderson 06/20/2003. Correstions required per Mike Hester.All patches in the asphalt must be seamless..Complete the Final Grading & testing report. Replace the damaged manhole collar on Commerce Dr. 07/16/2003. Corrections required per Mike Hester. provide the compaction tests on the underground utilities. 07/31/2003. Approved per Mike Hester, All areas west of River Road. |
| City Development Engineer | |
| Landscaping | |
| General Comments: | |