Hyde Berry Park
Number: Grading-48187

Drawing of Record Submitted 12/02/2015
Electronic Drawing 12/02/2015
Final Grading Report 12/02/2015
Date Scheduled 12/02/2015
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/02/2015 Corrections Required: 1) Clean concrete off all valve lids and meter box lids 2)Missing line sizes on valve collars. 3)Cut the concrete on all of the double services 4)Straighten one fire hydrant and two fire hydrants have been raised with extensions per Carson Tait
Wastewater 12/02/2015 Corrections Required: 1) Clean concrete off all valve lids and meter box lids 2)Missing line sizes on valve collars. 3)Cut the concrete on all of the double services 4)Straighten one fire hydrant and two fire hydrants have been raised with extensions per Carson Tait
Engineering 12/3/2015 Corrections Required: 1) Replace curb & walk broken 2)Monuments need to be replaced 3)Seal cracks in concrete curb 4)Trim expansion 5)Storm drain channel as per Brandon Wright 12/11/2015 Approved per Brandon Wright
City Development Engineer
Landscaping 12/04/2015 Approved per Ray Snyder
    
General Comments: