Drawing of Record Submitted |
12/02/2015 |
Electronic Drawing |
12/02/2015 |
Final Grading Report |
12/02/2015 |
Date Scheduled |
12/02/2015 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
12/02/2015 Corrections Required: 1) Clean concrete off all valve lids and meter box lids 2)Missing line sizes on valve collars. 3)Cut the concrete on all of the double services 4)Straighten one fire hydrant and two fire hydrants have been raised with extensions per Carson Tait |
Wastewater |
12/02/2015 Corrections Required: 1) Clean concrete off all valve lids and meter box lids 2)Missing line sizes on valve collars. 3)Cut the concrete on all of the double services 4)Straighten one fire hydrant and two fire hydrants have been raised with extensions per Carson Tait |
Engineering |
12/3/2015 Corrections Required:
1) Replace curb & walk broken
2)Monuments need to be replaced
3)Seal cracks in concrete curb
4)Trim expansion
5)Storm drain channel as per Brandon Wright
12/11/2015 Approved per Brandon Wright |
City Development Engineer |
|
Landscaping |
12/04/2015 Approved per Ray Snyder |
| |
General Comments: |
|