Bridle Gate Phase 4
Number: Grading-48171

Drawing of Record Submitted 04/15/2016
Electronic Drawing 04/15/2016
Final Grading Report 04/15/2016
Date Scheduled 04/19/2016
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 04/19/2016 Corrections required: 1) Drawing of record is wrong - No IRR line on it 2) End of IRR line put valve can on it w/collar & wire only in collar 3) Concrete around meter box on IRR system to City standards per Kevin Condie 05/03/2016 Corrections required: 1)Need new drawing of record with corrected irrigation. 05/04/2016 Approved per Kevin Condie
Wastewater 04/19/2016 Corrections required: 1) Drawing of record is wrong - No IRR line on it 2) End of IRR line put valve can on it w/collar & wire only in collar 3) Concrete around meter box on IRR system to City standards per Kevin Condie 05/03/2016 Corrections required: 1)Need new drawing of record with corrected irrigation. 05/04/2016 Approved per Kevin Condie
Engineering 04/20/2016 Corrections required: 1) Drawing of record is wrong - No IRR line on it 2) End of IRR line put valve can on it w/collar & wire only in collar 3) Concrete around meter box on IRR system to City stand per Tom Cullison 05/03/2016 Approved per Tom Cullison. Ok by Wes. Monument still needs stamped
City Development Engineer
Landscaping
    
General Comments: