Drawing of Record Submitted |
04/15/2016 |
Electronic Drawing |
04/15/2016 |
Final Grading Report |
04/15/2016 |
Date Scheduled |
04/19/2016 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
04/19/2016 Corrections required:
1) Drawing of record is wrong - No
IRR line on it
2) End of IRR line put valve can on
it w/collar & wire only in collar
3) Concrete around meter box on
IRR system to City standards per Kevin Condie
05/03/2016 Corrections required:
1)Need new drawing of record with corrected irrigation.
05/04/2016 Approved per Kevin Condie |
Wastewater |
04/19/2016 Corrections required:
1) Drawing of record is wrong - No
IRR line on it
2) End of IRR line put valve can on
it w/collar & wire only in collar
3) Concrete around meter box on
IRR system to City standards per Kevin Condie
05/03/2016 Corrections required:
1)Need new drawing of record with corrected irrigation.
05/04/2016 Approved per Kevin Condie |
Engineering |
04/20/2016 Corrections required:
1) Drawing of record is wrong - No
IRR line on it
2) End of IRR line put valve can on
it w/collar & wire only in collar
3) Concrete around meter box on
IRR system to City stand per Tom Cullison
05/03/2016 Approved per Tom Cullison. Ok by Wes. Monument still needs stamped |
City Development Engineer |
|
Landscaping |
|
| |
General Comments: |
|