| Drawing of Record Submitted | 04/15/2016 |
|---|---|
| Electronic Drawing | 04/15/2016 |
| Final Grading Report | 04/15/2016 |
| Date Scheduled | 04/19/2016 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 04/19/2016 Corrections required: 1) Drawing of record is wrong - No IRR line on it 2) End of IRR line put valve can on it w/collar & wire only in collar 3) Concrete around meter box on IRR system to City standards per Kevin Condie 05/03/2016 Corrections required: 1)Need new drawing of record with corrected irrigation. 05/04/2016 Approved per Kevin Condie |
| Wastewater | 04/19/2016 Corrections required: 1) Drawing of record is wrong - No IRR line on it 2) End of IRR line put valve can on it w/collar & wire only in collar 3) Concrete around meter box on IRR system to City standards per Kevin Condie 05/03/2016 Corrections required: 1)Need new drawing of record with corrected irrigation. 05/04/2016 Approved per Kevin Condie |
| Engineering | 04/20/2016 Corrections required: 1) Drawing of record is wrong - No IRR line on it 2) End of IRR line put valve can on it w/collar & wire only in collar 3) Concrete around meter box on IRR system to City stand per Tom Cullison 05/03/2016 Approved per Tom Cullison. Ok by Wes. Monument still needs stamped |
| City Development Engineer | |
| Landscaping | |
| General Comments: | |