Drawing of Record Submitted | |
---|---|
Electronic Drawing | |
Final Grading Report | |
Date Scheduled | |
BUILDING PERMIT RELEASE APPROVALS | |
Power | |
Water | |
Wastewater | |
Engineering | |
City Development Engineer | |
Landscaping | |
FINAL INSPECTION RELEASE APPROVALS | |
Power | |
Water | |
Wastewater | |
Engineering | |
City Development Engineer | |
Landscaping | |
General Comments: | |
Borrow site only. Will be carried out over the next several years. Required Hillside Dev. Permit. As of today 11/25/03 excavation is not yet complete. No restoration bond required due to being an already disturbed area and the duration of the permit. Drainage needs to be directed to the street along the Easterly boundary of the site. |