Drawing of Record Submitted |
|
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
12/26/2003. Approved. Power okay for final per Dennis Wright. |
Water |
12/30/2003. Corrections required per Jeff Lance. 9" min from top of lid to setter. setter must be centered in box. concrete needs to be straight with curb and to grade. Boxes too are in backwards.
05/20/2005 Corrections requried per Allen Briggs. Need corrections from punsh list items.. no corrections were made. |
Wastewater |
12/30/2003. Corrections required per Jeff Lance. 9" min from top of lid to setter. setter must be centered in box. concrete needs to be straight with curb and to grade. Boxes too are in backwards.
05/20/2005 Corrections requried per Allen Briggs. Need corrections from punsh list items.. no corrections were made. |
Engineering |
12/23/2003 Approved Per Larry H. |
City Development Engineer |
1/9/04. Approved per Catherine Hasfurther. |
Landscaping |
12/30/03. Corrections required, no street trees on 2000 N per Doug W and Mark B.
06/03/2005 Approved per Doug W. Trees's OK |
| |
General Comments: |
|