[Bedrock Townhomes Phase II]
Number: Grading 1099

Drawing of Record Submitted 10/6/03
Electronic Drawing
Final Grading Report 10/6/03
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power 9-25-02 OK Permits Only per Dennis Wright
Water 9-27-02 Approved per Kevin Condie if OK with fire OK with me
Wastewater 9-27-02 Approved per Kevin Condie if OK with fire OK with me
Engineering 9-24-02 OK Permits Only for Units 5 & 6 per Mike Hester 11-05-02 OK Permits Only per Mike Hester
City Development Engineer 9-24-02 Approved per Jay Sandberg for Units 5 & 6 only
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 05/27/04. Power okay for Final.
Water 05/01/2003 Corrections required per Kevin Condie 1.Middle hydrant need to be lowered to planter height 2.Paint under first hydrant 3.Need to check wire
Wastewater 05/01/2003 Corrections required per Kevin Condie 1.Middle hydrant need to be lowered to planter height 2.Paint under first hydrant 3.Need to check wire
Engineering 08/25/2004 Corrections required per Jay Sandberg. Private Improvement certification required.
City Development Engineer Approved per Mike Hester. For Final.
Landscaping 06/09/04. Approved per Doug W.
    
General Comments: