Drawing of Record Submitted |
06/20/2005 4 copies |
Electronic Drawing |
|
Final Grading Report |
07/28/2005 |
Date Scheduled |
08/15/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
08/16/2005 Approved per Dennis Wright |
Water |
04/14/2006 Approved per Kevin Condie |
Wastewater |
04/14/2006 Approved per Kevin Condie |
Engineering |
08/19/2005 Approved per Larry Henderson |
City Development Engineer |
08/23/2005 Corrections required per Cathy H. Electronic DWG of record--ok Hillside compliance letter. |
Landscaping |
08/16/2005 Corrections required per Ray Synder..1. Parks: To verify that landscaping is installed per plan by City Coucil.(Specs,quantites,cover slopes etc.)2. Planning Rocks(basalt),not yet startted per Hillside.Review board requirement. 3. Hillside compliance letter from Civil Eng required..Note: City Council meetings of 4-15-4..7-1-04 7-8-04 |
| |
General Comments: |
Site review by HRB on 12/10/03. Not approved. More details on mitigation of cuts, placement of rock on cut slope,
typical vegetation plan required before next review. Land owner, Gerry Brown, cautioned about Transite/Asbestos pipe existing on site. Remediation plan for disposal of Transite pipe required prior to issuance of grading permit. Concern for such was expressed at HRB review. Will be noted in minutes.
City will likely be involved in mitigation of cut slopes for the new Airport Road since the City has interest in seeing the Airport Road Constructed and has committed to participate in funding the roadway.
2/18/04 HRB met on site to review landscaping plan as requested from previous meeting. HRB recommended approval of Menlove site only (not to include Airport Road and upper access).
Site as approved will have only one access. |