Drawing of Record Submitted |
6-23-04 |
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
4/2/04 Corrections Required per Mike Hester. Complete sign installation. Remove all construction debris. Clean all public improvements. Complete monuments and lot corners. Backfill all sidewalk and curb. Complete the detention basion. Complete all sidewalk water meter collars. Repair paving ponds and defects.
4/12/04 approved PERMITS ONLY per Mike Hester |
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
4/12/04 - Approved per Jeff Lance.
06/17/04. Approved per Jeff Lance |
Wastewater |
4/12/04 - Approved per Jeff Lance.
06/17/04. Approved per Jeff Lance |
Engineering |
4/26/04 approved per Mike Hester
6/16/04 Corrections per Larry Henderson. Trim expansion joints, clean gutter, remove spilled concrete, seal cracked curb, remove dirt ramp from sidewalk complete pad grading, reset lot corners, seal cracked sidewalk, clean drop inlot boxes, reamp end of sidwalks, patch asphalt on sw corner 2300 east circle remove dumpster and john on corner of 2300 East circle.
7/15/04 Approved per Mike Hester |
City Development Engineer |
4/14/04 - approved for PERMITS ONLY - per Cathy Hasfurther
4/23/04 corrections required per Cathy Hasfurther - Drawing of record - electronic.
5/3/04 approved per Cathrine Hasfurther.
6/22/04 Corrections required per Cathy, Electronic drawing of record.
07/02/04. Approved per Cathy.
7/26/04. Approved per Cathy for Final |
Landscaping |
Phase 1 only - Approved per Mark Bradley 4/6/04
6/17/04 Approved Per Mark Bradley. N/A |
| |
General Comments: |
|