| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 4/21/04 corrections required per Kevin Condie. Remove collar around meter box and put rebar through meter box. Raise collar around valve where they tied onto main. |
| Wastewater | 4/21/04 corrections required per Kevin Condie. Remove collar around meter box and put rebar through meter box. Raise collar around valve where they tied onto main. |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| General Comments: | |