Drawing of Record Submitted | |
---|---|
Electronic Drawing | |
Final Grading Report | |
Date Scheduled | |
BUILDING PERMIT RELEASE APPROVALS | |
Power | |
Water | |
Wastewater | |
Engineering | |
City Development Engineer | |
Landscaping | |
FINAL INSPECTION RELEASE APPROVALS | |
Power | |
Water | 4/21/04 corrections required per Kevin Condie. Remove collar around meter box and put rebar through meter box. Raise collar around valve where they tied onto main. |
Wastewater | 4/21/04 corrections required per Kevin Condie. Remove collar around meter box and put rebar through meter box. Raise collar around valve where they tied onto main. |
Engineering | |
City Development Engineer | |
Landscaping | |
General Comments: | |