Shadow Mountain Townhomes (PD)
Number: Grading 28926

Drawing of Record Submitted 07/26/2004
Electronic Drawing 07/26/2004
Final Grading Report 07/26/2004
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water 06/07/04 Approved per Kevin Condie.
Wastewater 06/07/04 Approved per Kevin Condie.
Engineering 06/03/04 Corrections Required Per Larry Henderson. Not Approved, Submit Engineers Certification of walls, Submit plat (preliminary or final) provide improvement certifiction. Scmit as-built grading plan.
City Development Engineer 06/03/04 Corrections required per Jay Sandberg, comments are the same as Larry Henderson.
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 01/06/2005 Approved for Power per Dennis Wright.
Water 7/29/04 Correction required per Coty Chadburn. 1. Drawings of records. 2. No S" marks on gutters for lots #4,5,7,9,21. 3. Lot 15 has no c/o or "S" mark. 4. m/h in fornt of lot #2 need to have steps installed. 08/16/04 Corrections Required Per Boyd. Paint HYD #3. Lower setters #5. RP Box #1. 09/02/2004 Approved Per Kevin Condie
Wastewater 7/29/04 Correction required per Coty Chadburn. 1. Drawings of records. 2. No S" marks on gutters for lots #4,5,7,9,21. 3. Lot 15 has no c/o or "S" mark. 4. m/h in fornt of lot #2 need to have steps installed. 08/16/04 Corrections Required Per Boyd. Paint HYD #3. Lower setters #5. RP Box #1. 09/02/2004 Approved Per Kevin Condie
Engineering 07/28/04 Corrections required per Larry Henderson. Replace cross gutter, Clean out and grout inlet boxes and drain lines, Engineer to submit certification that walls are built to city spec and are in property lines per plat, remove forms from meter pads and sidewalk, trim expanison joints Remp ends of sidewalk and backfill behind sidewalks reset lot corners, Lot are not finish graded- engineer to verify, elevations. Meters in driveways to be traffic rated, mitigate-cut slopes per hillside review board submit final grading report, stamp monuments. 08/27/2004.Corrections requuired per Larry HendersonRemove forms from meter pads, revise as builts to show top ;and bottom of wall devs. Finish grade lots, Subdivisions certification from engineer. Final grading report. 09/28/2004 Approved per Larry Henderson.. 9-15 thru 9-17 not ready.. 9-21 not yet-clean up to do.. 9-24 all clean up no done.. 9-28 ok 11/17/2004 Approved for lots 33- 35 only Per Jay Sandberg(per phone Converstation)
City Development Engineer 08/25/2004 Corrections required per Jay Sandberg. Need detail as- built shown walls and pad elevations. Need private improvement certification. GeoTechnical cert. Ok. 9-17-03 Drawing of Record OK, Improvements Certification OK, Rock Wall Certification OK, however, plat is not approved by City Council yet. No permits. 12/22/2004 Approved for Two more lots #16 and #17 per Jay Sandberg 01/07/2005 Approved Per Jay Sandberg
Landscaping 09/01/2004 Approved by Mark Bradley Have letter from Mansfield Jennings ( Landscaping common area). Dated 8-31-04.
    
General Comments: