Pointe at Sunbrook Phase 1, The
Number: Grading 30433

Drawing of Record Submitted Received drawing of records 6/8/04( 4 copies)
Electronic Drawing 3/18/04
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power 7/01/04 Power ok for permits only
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 6/21/04. Corrections required per Kevin C. 1. Move rebar back in meter setter's all of them. 2. Setter on lot # 9. 3. Level setter lot #15. 4. Wire in middle of valve box- re-do. 5. valve can on end of lines, 6. Straighten up fire hydrant, 8. Turn hydrant with road. 06/30/04. Ok for final per Kevin C.
Wastewater 6/21/04. Corrections required per Kevin C. 1. Move rebar back in meter setter's all of them. 2. Setter on lot # 9. 3. Level setter lot #15. 4. Wire in middle of valve box- re-do. 5. valve can on end of lines, 6. Straighten up fire hydrant, 8. Turn hydrant with road. 06/30/04. Ok for final per Kevin C.
Engineering 6/17/04 Corrections per Larry Henderson. Tie in sidewalk into existing at cart ramp on south side of street, Clean inlet boxes, install street lights, ramp ends of sidewalks, Remove spilled concrete, Grout around pipes in inlet boxes, replace missing lot corners. 6/22/03. Corrections required per Larry H. Install street lights, raise stop sign @ box canyon and lost creek to 7'. Ramp sidewalk ends, Clean and grout inlet boxes. 7/01/04 Approved Per Larry Henderson
City Development Engineer 6/22/04. Approved per Cathy.
Landscaping 6/17/04. Approved per Mark Bradley. N/A.
    
General Comments: