Drawing of Record Submitted |
|
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
5-06-02 OK per Larry Hester
5-06-02 OK for lots 35,40 and 41 per Larry Hendersen - Still need to clean up lots 47,48 and 49. |
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
1-25-02 Approved per Don Higgins |
Water |
1-25-02 Corrections Required per Kevin Condie - 1)Need contractor to dig & cut off pipe that stub into property in culdesac 2)Need to have contractor walk through system and show me meter setters and valves then they may have more on punch list.
3-11-02 Approved as per Kevin Condie |
Wastewater |
1-25-02 Corrections Required per Kevin Condie - 1)Need contractor to dig & cut off pipe that stub into property in culdesac 2)Need to have contractor walk through system and show me meter setters and valves then they may have more on punch list.
3-11-02 Approved as per Kevin Condie |
Engineering |
1-18-02 Corrections Required per Mike Hester - 1)Mark all water & sewer locations on curb. 2)Patch with seika 1A all cracks in curb & gutter. 3)Clean concrete from pouring sidewalk off curb & gutter. 4)Replace the traffic lid for "Sewer" placed in the sidewalk with a walkway style lid. 5)Remove debris from lots 47,48 & 49. 6)Install all lot corners and monumentation. 7)Install street & traffic control signs.
6-28-02 Approved per Mike Hester
|
City Development Engineer |
5-06-02 Approved as per Judd Burgess |
Landscaping |
1-24-02 Corrections Required per Mark Bradley - Complete wall along 900 S. and install required landscaping.
6-28-02 Corrections Required per Mark Bradley - Landscape is not in. Install and complete prior to requesting an inspection.
9-05-02 OK per Doug Wulfenstein |
| |
General Comments: |
|