[Painted Desert Estates Phase lV]
Number: Grading 32301

Drawing of Record Submitted 10/25/2004
Electronic Drawing
Final Grading Report 11/03/2004
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water 08/25/04 Approved per Carson Tait Permits only
Wastewater 08/25/04 Approved per Carson Tait Permits only
Engineering 6/24/04 Approved per Larry Henderson. Submit drawing of record, Submit final grading report.
City Development Engineer 08/25/2004 Approved for Permits only... OBD required.. (owner,builder,developer agreement).
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 12/01/2004 Corrections required per Boyd.. Checked Monday.. Need to repair/replace the meter box pads that have settled and tilted.. 11-29 thru 21-01 Still not working 12/30/2004 Corrections required per Allen Briggs., 1. Saw cut water mars in curb, remove debris from box for meter access lot 93. 2. Remove debirs from lot 60 meter box for areas. 3. Replace concrete and raise boxes to grade lot 70.71 4. Replace concrete and raise boxes to grade, hyd trace wire to be exposed on lot 61 62.. 5. Lot 94 and 93 concrete around hydrant must be lkower than break- away bolts and must drain away from hydrant. 6. Wire trace test preformed 02/03/2005 Corrections required per Allen Briggs.. Remove debris from inside meter boxes ( I.E concrete and mud) replace meter lids that are covered with concrete. 02/08/2005 Approved per Allen Briggs.
Wastewater 12/01/2004 Corrections required per Boyd.. Checked Monday.. Need to repair/replace the meter box pads that have settled and tilted.. 11-29 thru 21-01 Still not working 12/30/2004 Corrections required per Allen Briggs., 1. Saw cut water mars in curb, remove debris from box for meter access lot 93. 2. Remove debirs from lot 60 meter box for areas. 3. Replace concrete and raise boxes to grade lot 70.71 4. Replace concrete and raise boxes to grade, hyd trace wire to be exposed on lot 61 62.. 5. Lot 94 and 93 concrete around hydrant must be lkower than break- away bolts and must drain away from hydrant. 6. Wire trace test preformed 02/03/2005 Corrections required per Allen Briggs.. Remove debris from inside meter boxes ( I.E concrete and mud) replace meter lids that are covered with concrete. 02/08/2005 Approved per Allen Briggs.
Engineering 11/04/2004 Corrections Required per Mike Hester.1. Complete monumentation. 2. Clean and grout all strom drain pipe and inlets. 3. Clean all public improvements. 4. Correct the final grading and materials testing report to include the power, phone and cable TV trench compaction. 5. Install street and traffic control signs. 6. Backfill all interior street curb and gutter. 7. Secure street light pole base and install inspection hole plate. 8. Shoulder the EP on 2450 So 9. Have a good Day.. 12/29/2004 Corrections required per Mike Hester.. Complete all items on the last correction list. 02/04/2005 Approved per Mike Hester
City Development Engineer 02/09/2005 Approved per Jay Sandberg.. Private Improvement Certification ok
Landscaping 11/12/2004 Corrections required per Doug W. No trees's in the section 11/16/2004 Approved per Doug W. 12/02/2004 Approved per Doug W.
    
General Comments: