| Drawing of Record Submitted | 07/30/2004 |
|---|---|
| Electronic Drawing | |
| Final Grading Report | 07/30/2004 |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | DREA |
| Water | 08/09/04 Corrections Required. Per Carson Tait. Need to add the corner lot 3/4" water service before calling for a final inspection. 08/18/2004 Approved per Boyd. |
| Wastewater | 08/09/04 Corrections Required. Per Carson Tait. Need to add the corner lot 3/4" water service before calling for a final inspection. 08/18/2004 Approved per Boyd. |
| Engineering | 08/03/04. Corrections required per Mike Hester. 1. Backfill all sidewalk A minimun of 1' beyond the back of walk. 2. Install traffic control and street name signs. 3. Install all property corners. 4. Install monumentation. 5. the drawing of record. 08/17/04. Approved per Mike Hester. |
| City Development Engineer | 08/20/04. Approved Per Cathy |
| Landscaping | 08/02/04. Approved Per Mark Bradley |
| General Comments: | |