[Olive Grove 1]
Number: Grading 31044

Drawing of Record Submitted 08/04/04 Revised records 9-8-04
Electronic Drawing 08/04/04 Lonnie
Final Grading Report 08/04/04
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 08/23/04. Approved per Dennis Wright. Power ok Phase 1
Water 08/05/04 Correction required. Per Kevin C. Paint under brake away Flg- with red paint. Need Property corners. Need size of line in collars. 08/27/2004 Approved per Kevin Condie 10/04/2004 Approved per Kevin Condie
Wastewater 08/05/04 Correction required. Per Kevin C. Paint under brake away Flg- with red paint. Need Property corners. Need size of line in collars. 08/27/2004 Approved per Kevin Condie 10/04/2004 Approved per Kevin Condie
Engineering 08/05/04 Corrections Required Per Larry Henderson. Trim expansion joints, Install street lights on Dixie Dr. Install street name and stop signs. Surveyer to mark monuments, Surveyer to reset lot corners.Engineer to submit compliance letter and disk, Clean off spilled concrete, Place more vip rap around bottom of spillway of drain construct retaining walls. Pour water meter pad, Need break results for cylinder set 520482. 10/13/2004 Approved per Larry Henderson
City Development Engineer 08/23/04 Corrections requuired per Cathy. Private development cert. electronic Dwg. of record, Cut in ditch along the northeast side of roadway from canyon view to Rogers property. 10/13/2004 Approved per Cathy ... Electronic drawing of record 9/13/06 - 1yr warranty. Corrections required per Ken B - Repair chunks missing out of curbing at many locations.
Landscaping 08/16/04. Corrections Required Per Doug W. No Trees. 10/15/2004 Corrections Required per Doug W. No Trees 9/13/06 1 year warranty Approved per Ken B.
    
General Comments: