| Drawing of Record Submitted | 08/17/2004 |
|---|---|
| Electronic Drawing | |
| Final Grading Report | 08/17/2004 |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 08/12/04. Approved per Dennis Wright. Power ok for Final. |
| Water | 08/12/04 Corrections Required Per Kevin Condie. Test backflow, Raise meter and setter, Arrow in valve coller No Rebar in meter boxes. 08/18/2004 Approved Per Boyd |
| Wastewater | 08/12/04 Corrections Required Per Kevin Condie. Test backflow, Raise meter and setter, Arrow in valve coller No Rebar in meter boxes. 08/18/2004 Approved Per Boyd |
| Engineering | 08/12/04 Correction required per Mike Hester.. Complete all construction and clean all improvements, then call in for inspection. 08/20/04 Approved per Mike Hester |
| City Development Engineer | 08/20/04 Approved per Cathy Hasfurther Needs to revise Electronic drawings of recors. |
| Landscaping | 08/12/04. Corrections Required Per Mark Bradley. Not Ready... Landscape has not been installed. Parking lot not completed (in process). 08/20/04 Approved Per Doug W. |
| General Comments: | |