Drawing of Record Submitted |
08/17/2004 |
Electronic Drawing |
|
Final Grading Report |
08/17/2004 |
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
08/12/04. Approved per Dennis Wright. Power ok for Final. |
Water |
08/12/04 Corrections Required Per Kevin Condie. Test backflow, Raise meter and setter, Arrow in valve coller No Rebar in meter boxes.
08/18/2004 Approved Per Boyd |
Wastewater |
08/12/04 Corrections Required Per Kevin Condie. Test backflow, Raise meter and setter, Arrow in valve coller No Rebar in meter boxes.
08/18/2004 Approved Per Boyd |
Engineering |
08/12/04 Correction required per Mike Hester.. Complete all construction and clean all improvements, then call in for inspection.
08/20/04 Approved per Mike Hester |
City Development Engineer |
08/20/04 Approved per Cathy Hasfurther
Needs to revise Electronic drawings of recors. |
Landscaping |
08/12/04. Corrections Required Per Mark Bradley. Not Ready... Landscape has not been installed. Parking lot not completed (in process).
08/20/04 Approved Per Doug W. |
| |
General Comments: |
|