| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | 4-11-01 Corrections Required per Don Higgins - Consultation meeting to determine what needs to be done - no power available |
| Water | 4-13-01 Corrections Required per Kevin -Consultation meeting to determine what needs to be done - change setter, rechloridate & pressure test |
| Wastewater | 4-13-01 Corrections Required per Kevin -Consultation meeting to determine what needs to be done - change setter, rechloridate & pressure test |
| Engineering | 4-11-01 Corrections Required per Mike Heston - 1)Provide an interum grading report for all underground installations, curb & gutter and cross gutters, conrete testing - 2)Remove all debris and reprocess the roadway sub-grade then base and compact - 3)Address the lot drawings problems, most are too low - 4)Install the gas crossing sleeves - 5)Engineering need to approve revised civil plans |
| City Development Engineer | 4-05-01 Corrections Required per Jack Voris - 1)Provide revised civil drawings - 2)grade lots to drain (fill) - 3)test water, sewer, power - 4)Provide compaction tests for sewer water power trenching |
| Landscaping | 5-01-01 Approved per Doug Wulfenstein |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 9-06-00 Corrections Required per Don Higgins - We do not even have an approved plan. Power system will need to be completely installed and energized. |
| Water | 9-07-00 Corrections Required per Kevin - Need to have week removed so we can see what is there - Need to re-chlorinate, flush, pressure test, setters, boxes, concrete collars on boxes and valve and hydrants - there may be more than this? |
| Wastewater | 9-07-00 Corrections Required per Kevin - Need to have week removed so we can see what is there - Need to re-chlorinate, flush, pressure test, setters, boxes, concrete collars on boxes and valve and hydrants - there may be more than this? |
| Engineering | 9-06-00 Corrections Required per Mike Hester - Clear the weeds & brush in the road & r/w so an inspection can be made. |
| City Development Engineer | Approved per Jack Voris |
| Landscaping | 9-06-00 Approved per Doug Wulfenstein |