| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 09/12/1996 Approved per dennis Wright.. Power is ok for final. |
| Water | 09/12/1996 Corrections required per Carson Tait.. Need drawing of record, concrete collar in street (around valve box) |
| Wastewater | 09/12/1996 Corrections required per Carson Tait.. Need drawing of record, concrete collar in street (around valve box) |
| Engineering | 09/26/1996. Approved per Mike Hester. 09/23/2004 Corrections required per Mike Hester.. Unit 4 fire hydrant needs to be protected by ballards and have a concrete to collar poured area at the base. |
| City Development Engineer | 09/12/1996 Approved per Judd |
| Landscaping | 09/12/1996 Approved per Doug.. ok |
| General Comments: | |