| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | 06/08/2005 Approved for permits Only Per CathyH. For Mike Hester Phase 5 Only. |
| City Development Engineer | 02/08/2005 Approved per Cathy Hasfurther..Phase 4.. Electronic DWG of Record --ok 06/08/2005 Approved for Permits Only Phase 5. Cathy H.. Catch basin grate to be placed. |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 02/05/2005 Phase 6.. Correction required per Allen Briggs.. Remove concrete from hydrants bolts and caps Ensure all valves are accessiable. Phase 6.. 02/05/2005 Phase 4 Corrections requried per Allen Briggs Remove concrete from within meter boxes, and off meters. remove rebar from inside of boxes on hyd in front of bldg #4. Pour hyd pad and meter box in front of unit #158. Ensure all valves are accessiable. Provide sanitary survery on backflow report for pour mech room. 02/09/2005 Approved per Carson Tait..Phase 6 |
| Wastewater | 02/05/2005 Phase 6.. Correction required per Allen Briggs.. Remove concrete from hydrants bolts and caps Ensure all valves are accessiable. Phase 6.. 02/05/2005 Phase 4 Corrections requried per Allen Briggs Remove concrete from within meter boxes, and off meters. remove rebar from inside of boxes on hyd in front of bldg #4. Pour hyd pad and meter box in front of unit #158. Ensure all valves are accessiable. Provide sanitary survery on backflow report for pour mech room. 02/09/2005 Approved per Carson Tait..Phase 6 |
| Engineering | 01/04/2005 Corrections required per ike Hester.. Not Ready. 01/10/2005 Corrections required per Mike Hester.. 1. Clean all publlic improvements, 2. Replace all damaged sidewalk. 3. Complete all landscaping. 02/02/2005 Approved per Mike Hester phase 4 03/10/2005 Approved Per Mike Hester Phase 6 8/25/2015 Approved 1 yr warranty per Kevin Condie |
| City Development Engineer | 02/08/2005 Approved per Cathy Hasfurther..Phase 4.. Electronic DWG of Record --ok 02/17/2005 Corrections required per Cathy.. Electronic DWG of Record,, private development certificate Approved per Cathy Phase #6 |
| Landscaping | 02/08/2005 Approved per Doug W. Phase IV and VI only |
| General Comments: | |