[Las Palmas Building 18]
Number: Grading-31273

Drawing of Record Submitted
Electronic Drawing
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 02/18/2005 Power ok for Final
Water 02/14/2005 Corrections required per Kevin Condie..1. Arrows in valve collars, no concrete around meter and hydrant, check wire, check valve to see if open.. 02/18/2005 Approved per Kevin Condie BOND.
Wastewater 02/14/2005 Corrections required per Kevin Condie..1. Arrows in valve collars, no concrete around meter and hydrant, check wire, check valve to see if open.. 02/18/2005 Approved per Kevin Condie BOND.
Engineering 02/09/2005 Corrections required per Larry Henderson..Backfill behind curbs,clean streets,pour hydrant and meter pads,curb covered with dirt can't see project,not complete when clean.. will reinspect. 02/17/2005 Approved per Larry Henderson
City Development Engineer 02/17/2005.. Corrections required per Cathy.. Private development cert.. electronic DWG of record. Final grading report. 02/25/2005 Approved per Cathy H
Landscaping 02/17/2005 Corrrections required per Mark Bradley.. Site not completed--landscaping-parking/concrete sidewalks. 02/17/2005 Corrections required per Mark Bradley.. See 2-17-05 Comments.. Complete site.landscaping-parking-sidewalks 02/25/2005 Approved Mark Bradley.. working with landscape due to rain
    
General Comments: