Drawing of Record Submitted |
06/06/2005 (2 Copies)Phase 5..08/09/2005 Phase 5,7,8 |
Electronic Drawing |
08/09/2005 Phase 5,7,8 |
Final Grading Report |
06/06/2005 Phase 5...08/09/2005 phase 5,7,8 |
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
02/05/2005 Corrections required per Allen Briggs Permits will not be given until Hyd and meter boxesa are poured in concrete and valves are raised to grade. |
Wastewater |
02/05/2005 Corrections required per Allen Briggs Permits will not be given until Hyd and meter boxesa are poured in concrete and valves are raised to grade. |
Engineering |
03/24/2005 Approved per Mike Hester Phase 5 & 7 permits only |
City Development Engineer |
Approved per Cathy H. Permits only for Phase 7 & 8 only |
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
03/30/2005 Corrections required per Tim Jones.. Need drawing of record for each phase.
03/30/2005 Approved per Time Jones phone call @ 11:05
06/07/2005 Approved per Tim Jones Phase 5 only
08/26/2005 Approved per Tim Jones |
Wastewater |
03/30/2005 Corrections required per Tim Jones.. Need drawing of record for each phase.
03/30/2005 Approved per Time Jones phone call @ 11:05
06/07/2005 Approved per Tim Jones Phase 5 only
08/26/2005 Approved per Tim Jones |
Engineering |
02/01/2005 Corrections required per Mike Hester Phase 5.. Still under construction.
02/10/2005 Corrections required per Mike Hester.NOT READY.. Complete all curb and gutter, complete all drainage boxes and inlets, Finish grade all pads.
02/11/2005 Corrections required per Mike Hester.. Complete the correctiosn listed on 2-10-05
08/24/2005 Corrections required per Larry Henderson.Verify asphalt densities in grading report,trim expansion joints,clean out inlet boxes, clean streets and walks in phase 8,Bldg 39 replace broken sidewalk, seal cracks in curbs,clean out detention basin and replace grate
08/24/2005 Corrections required per Larry H..Verify asphalt densities in grading report.Trim expansion joints, clean out inlet boxes,clean streets and walks in phase 8., Bldg 39 replace broken sidewalk,seal cracks in curbs, clean out detention basin and replace grate.
08/26/2005 Approved per Larry Henderson
8/14/2015 Approved Phase 5 1 yr warranty per Brandon Wright
|
City Development Engineer |
08/23/2005 Corrections required per Cathy H. Electronic Dwg of record--ok Private Development Certificate
08/26/2005 Approved per Cathy H
8/3/06 1 year warranty (City Project Engineer) Corrections Required per Ken B - Chips missing in curbs, trash in storm drains, sidewalk failure. |
Landscaping |
08/16/2005 Approved per Mark Bradley.. Working with developers on fencing.
08/15/2005 Approved Per Doug W
8/3/06 1 year warranty (PARKS) Approved per Ken B. |
| |
General Comments: |
|