| Drawing of Record Submitted | 05/16/2005 |
|---|---|
| Electronic Drawing | 05/16/2005 |
| Final Grading Report | 05/16/2005 |
| Date Scheduled | 05/18/2005 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | 05/24/2005 Approved per Cathy Hasfurther |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 05/19/2005 Approved per Dennis Wright |
| Water | 05/19/2005 Corrections required per Kevin Condie.. Meter boxes are not approved is St George. change out lids to heaver lids. 05/24/2005 Approved per Kevin Condie.. 09/25/2006 Approved per Kevin Condie..1 year warranty |
| Wastewater | 05/19/2005 Corrections required per Kevin Condie.. Meter boxes are not approved is St George. change out lids to heaver lids. 05/24/2005 Approved per Kevin Condie.. 09/25/2006 Approved per Kevin Condie..1 year warranty |
| Engineering | 05/19/2005 Approved per Larry Henderson |
| City Development Engineer | 05/19/2005 Corrections required per Cathy H.. Private Development Imp. Certificate. Elec. DWG of Record. 10 per cent warranty bond. 05/24/2005 Partial.. Approved( Permits Only) per Cathy H. 10/12/2005 Approved per Cathy H. Private Development Imp. Certificate-- not required. Electronic Dwg of record ..ok 09/15/2006.. Approved pe Ken B. 1 yr warranty |
| Landscaping | 05/17/2005 Approved per Mark Bradley.. N/A 09/15/2006 Approved per Ken B. 1 yr warranty |
| General Comments: | |