Drawing of Record Submitted |
05/16/2005 |
Electronic Drawing |
05/16/2005 |
Final Grading Report |
05/16/2005 |
Date Scheduled |
05/18/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
05/24/2005 Approved per Cathy Hasfurther |
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
05/19/2005 Approved per Dennis Wright |
Water |
05/19/2005 Corrections required per Kevin Condie.. Meter boxes are not approved is St George. change out lids to heaver lids.
05/24/2005 Approved per Kevin Condie..
09/25/2006 Approved per Kevin Condie..1 year warranty |
Wastewater |
05/19/2005 Corrections required per Kevin Condie.. Meter boxes are not approved is St George. change out lids to heaver lids.
05/24/2005 Approved per Kevin Condie..
09/25/2006 Approved per Kevin Condie..1 year warranty |
Engineering |
05/19/2005 Approved per Larry Henderson |
City Development Engineer |
05/19/2005 Corrections required per Cathy H.. Private Development Imp. Certificate. Elec. DWG of Record. 10 per cent warranty bond.
05/24/2005 Partial.. Approved( Permits Only) per Cathy H.
10/12/2005 Approved per Cathy H. Private Development Imp. Certificate-- not required. Electronic Dwg of record ..ok
09/15/2006.. Approved pe Ken B. 1 yr warranty |
Landscaping |
05/17/2005 Approved per Mark Bradley.. N/A
09/15/2006 Approved per Ken B. 1 yr warranty |
| |
General Comments: |
|