Drawing of Record Submitted |
04/26/2005.. Revised 4/28/2005 |
Electronic Drawing |
|
Final Grading Report |
04/27/2005 |
Date Scheduled |
04/28/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
04/26/2005 Corrections required per Tim Jones.. Pre-Final.. No drawing of Record.. 2" meter box needs concrete pad poured. 2 valves in side street entrance are hard to operate. Maybe bent.
04/27/2005 Approved per Phone Call.. Tim Jones |
Wastewater |
04/26/2005 Corrections required per Tim Jones.. Pre-Final.. No drawing of Record.. 2" meter box needs concrete pad poured. 2 valves in side street entrance are hard to operate. Maybe bent.
04/27/2005 Approved per Phone Call.. Tim Jones |
Engineering |
04/28/2005 Approved Per Mike Hester |
City Development Engineer |
04/28/2005 Approved per Jay Sandberg.. Elevation Certificate ok.. Not in erosion hazard boundary.. Plat to be recored to Boulder Springs phase 2 plat |
Landscaping |
04/28/2005 Corrections required per Mark Bradley.. Landscape not yet completed, verify Drive aisle width between parking stalls North of the building and the center parking area. The width appears less than 25ft. I did not have a tape measure but by pacing the area off it was around 22ft. Where is the enclouse for the dumpster?
04/29/2005 Approved Mark Bradley.. Received a letter on completion of rock striping adjustment whrer necessary and dumpster enclosure. |
| |
General Comments: |
|