Summit Athletic CLub
Number: Grading-31501

Drawing of Record Submitted 04/26/2005.. Revised 4/28/2005
Electronic Drawing
Final Grading Report 04/27/2005
Date Scheduled 04/28/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 04/26/2005 Corrections required per Tim Jones.. Pre-Final.. No drawing of Record.. 2" meter box needs concrete pad poured. 2 valves in side street entrance are hard to operate. Maybe bent. 04/27/2005 Approved per Phone Call.. Tim Jones
Wastewater 04/26/2005 Corrections required per Tim Jones.. Pre-Final.. No drawing of Record.. 2" meter box needs concrete pad poured. 2 valves in side street entrance are hard to operate. Maybe bent. 04/27/2005 Approved per Phone Call.. Tim Jones
Engineering 04/28/2005 Approved Per Mike Hester
City Development Engineer 04/28/2005 Approved per Jay Sandberg.. Elevation Certificate ok.. Not in erosion hazard boundary.. Plat to be recored to Boulder Springs phase 2 plat
Landscaping 04/28/2005 Corrections required per Mark Bradley.. Landscape not yet completed, verify Drive aisle width between parking stalls North of the building and the center parking area. The width appears less than 25ft. I did not have a tape measure but by pacing the area off it was around 22ft. Where is the enclouse for the dumpster? 04/29/2005 Approved Mark Bradley.. Received a letter on completion of rock striping adjustment whrer necessary and dumpster enclosure.
    
General Comments: