Drawing of Record Submitted |
05/02/2005..05/05/2005 05/06/2005 |
Electronic Drawing |
05/02/2005..05/05/2005 |
Final Grading Report |
05/02/2005 |
Date Scheduled |
05/04/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
05/05/2005 Corrections required per Tim Jones.. Lot 12 no water mark, valve can at tee in front of lot 2 has no tracing wire. Backflow has no inspection tag.
06/16/2005 Approved per Tim Jones |
Wastewater |
05/05/2005 Corrections required per Tim Jones.. Lot 12 no water mark, valve can at tee in front of lot 2 has no tracing wire. Backflow has no inspection tag.
06/16/2005 Approved per Tim Jones |
Engineering |
05/06/2005 Approved per MIke Hester Phase 1 & 2 |
City Development Engineer |
05/05/2005 Approved per Jason Draper
8/3/06 1 year warranty (City Project Engineer) Corrections Required per Ken B - Building materials blocking street and sidewalks, dirt covering sidewalks, trash in street, steamer cap off of fire hydrants, asphalt spalling, concrete cleaned out in the street, trash in storm drain. |
Landscaping |
05/06/2005 Corrections required per Mark Bradley..Complete landscaping along 1450 South, Submit revised grading plan for rock cut with geotech acknowledgement.. Provide a Hillisde compliance letter.
06/14/2005 Corrections required per Mark Bradley.. Provide a Hillside compliance letter. Polish road cut, submit revised grading plan with geotech. Acknowledgment.
08/17/2005 Approved per Mark Bradley For Phase 1 only (Landscape)
8/3/06 1 year warranty (PARKS) approved per Ken B. |
| |
General Comments: |
|