| Drawing of Record Submitted | 05/02/2005..05/05/2005 05/06/2005 |
|---|---|
| Electronic Drawing | 05/02/2005..05/05/2005 |
| Final Grading Report | 05/02/2005 |
| Date Scheduled | 05/04/2005 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 05/05/2005 Corrections required per Tim Jones.. Lot 12 no water mark, valve can at tee in front of lot 2 has no tracing wire. Backflow has no inspection tag. 06/16/2005 Approved per Tim Jones |
| Wastewater | 05/05/2005 Corrections required per Tim Jones.. Lot 12 no water mark, valve can at tee in front of lot 2 has no tracing wire. Backflow has no inspection tag. 06/16/2005 Approved per Tim Jones |
| Engineering | 05/06/2005 Approved per MIke Hester Phase 1 & 2 |
| City Development Engineer | 05/05/2005 Approved per Jason Draper 8/3/06 1 year warranty (City Project Engineer) Corrections Required per Ken B - Building materials blocking street and sidewalks, dirt covering sidewalks, trash in street, steamer cap off of fire hydrants, asphalt spalling, concrete cleaned out in the street, trash in storm drain. |
| Landscaping | 05/06/2005 Corrections required per Mark Bradley..Complete landscaping along 1450 South, Submit revised grading plan for rock cut with geotech acknowledgement.. Provide a Hillisde compliance letter. 06/14/2005 Corrections required per Mark Bradley.. Provide a Hillside compliance letter. Polish road cut, submit revised grading plan with geotech. Acknowledgment. 08/17/2005 Approved per Mark Bradley For Phase 1 only (Landscape) 8/3/06 1 year warranty (PARKS) approved per Ken B. |
| General Comments: | |