| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 5/11/06 APPROVED per Tim Dotsen 4/18/07 1 year warranty - Corrections required per Wayne M - Need to repour valve collars in River Rd. - not at grade - is a speed bump in the road. |
| Wastewater | 5/11/06 APPROVED per Tim Dotsen 4/18/07 1 year warranty - Corrections required per Wayne M - Need to repour valve collars in River Rd. - not at grade - is a speed bump in the road. |
| Engineering | 05/16/2006 Approved per Carlos Robles..Need to Fix Asphalt by 5-26-06 |
| City Development Engineer | 5/16/06 -Corretions required per Cathy H.. Dwg of record needs to provide pts showing location of sewer c.o., storm drain, in lets/ catch basins, etc. Electronic dwg of record needs to be submitted in autocad format. 05/16/2006 Approved per Cathy H. 4/16/07 1 year warranty - Approved per Ken B. - Need to check public roadway only (River Rd). |
| Landscaping | 4/16/07 1 year warranty - Approved per Ken B. |
| General Comments: | |