Drawing of Record Submitted |
11/02/2005 |
Electronic Drawing |
11/02/2005 |
Final Grading Report |
11/02/2005 |
Date Scheduled |
11/07/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
11/07/2005 Corrections required per Kevin Condie.. Need backflow on chemical despenses RP-or air gap.
11/10/2005 Approved per Kevin Condie
10/03/2006 Approved Per Kevin Condie..1 year warranty |
Wastewater |
11/07/2005 Corrections required per Kevin Condie.. Need backflow on chemical despenses RP-or air gap.
11/10/2005 Approved per Kevin Condie
10/03/2006 Approved Per Kevin Condie..1 year warranty |
Engineering |
11/08/2005 Approved per Larry Henderson |
City Development Engineer |
11/04/2005 Approved per Jay Sandberg..Note: A "Do not enter" sign was placed inappropriately and asked to be removed.. See Plans. |
Landscaping |
11/07/2005 Approved per Ray Synder |
| |
General Comments: |
|