| Drawing of Record Submitted | 11/02/2005 |
|---|---|
| Electronic Drawing | 11/02/2005 |
| Final Grading Report | 11/02/2005 |
| Date Scheduled | 11/07/2005 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 11/07/2005 Corrections required per Kevin Condie.. Need backflow on chemical despenses RP-or air gap. 11/10/2005 Approved per Kevin Condie 10/03/2006 Approved Per Kevin Condie..1 year warranty |
| Wastewater | 11/07/2005 Corrections required per Kevin Condie.. Need backflow on chemical despenses RP-or air gap. 11/10/2005 Approved per Kevin Condie 10/03/2006 Approved Per Kevin Condie..1 year warranty |
| Engineering | 11/08/2005 Approved per Larry Henderson |
| City Development Engineer | 11/04/2005 Approved per Jay Sandberg..Note: A "Do not enter" sign was placed inappropriately and asked to be removed.. See Plans. |
| Landscaping | 11/07/2005 Approved per Ray Synder |
| General Comments: | |