Drawing of Record Submitted |
05/09/2005 4 copies |
Electronic Drawing |
05/09/2005 |
Final Grading Report |
05/09/2005 |
Date Scheduled |
05/11/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
05/11/2005 Approved per Dennis Wright
05/15/2006 Approved per Dennis Wright.. For 1 year warranty. |
Water |
05/13/2005 Approved per Tim Jones
05/15/2006 Approved per Tim Dotson.. For 1 year warranty |
Wastewater |
05/13/2005 Approved per Tim Jones
05/15/2006 Approved per Tim Dotson.. For 1 year warranty |
Engineering |
05/11/2005 Corrections required per Mike Hester..The Drawing of Record must be done by the Engineer of record(MRW)The drawing must be titled and dated.. The Drawing of Record also is required in 2 formats .. Paper and electronic for public record.
05/13/2005 Approved for Mike Hester per Jason Draper |
City Development Engineer |
05/12/2005 Approved per Jason Draper.. Final plat to be recorded before occupancy. |
Landscaping |
05/12/2005 Approved Per Mark Bradley.. A correction in the field will be made by June 1, 2005 on a Drive aisle width. |
| |
General Comments: |
|