[Bubble Bath Car Wash]
Number: Grading-33099

Drawing of Record Submitted 09/02/2005..revised 09/15/2005
Electronic Drawing 09/02/2005..revised 09/15/2005
Final Grading Report 09/06/2005
Date Scheduled 09/06/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 09/06/2005 Approved per Dennis Wright
Water 09/09/2005 Corrections required -per Carson Tait..Need to install two backflow assemblies and have them tested and tagged. Need to pour concrete collars and pads around hydrant, meter box, and valve box. Need to install shut off valve handle. May need to install Fire Hydrant bollards. 09/15/2005 Approved per Carson ..Nice job! Thank you! 09/16/2005 Approved per Carson Tait 08/09/2006 Approved per Tim Dotson..1 year warranty
Wastewater 09/09/2005 Corrections required -per Carson Tait..Need to install two backflow assemblies and have them tested and tagged. Need to pour concrete collars and pads around hydrant, meter box, and valve box. Need to install shut off valve handle. May need to install Fire Hydrant bollards. 09/15/2005 Approved per Carson ..Nice job! Thank you! 09/16/2005 Approved per Carson Tait 08/09/2006 Approved per Tim Dotson..1 year warranty
Engineering 09/06/2005 Corrections required per Larry Henderson..Revise drawing of record, wash riprap not done trim expansion joints, ramp end od sidewalk, remove pallet and other construction debris, backfill around phone pedestal, Install sock or screen aroud drain inlet to catch mud and debris.. Do Not wash into wash, clean out inlet box, onsite and off site, cut off pipe and grout around pipe in curb inlet, ground sinking around power pole base on riverside, remove traffic control from 1990 East and riverside Dr, Final grading report, clean steet and sidewalk. 09/16/2005 Appproved per Larry H
City Development Engineer 09/06/2005 Corrections required per Jay Sandberg..Need better drawing of record showing improvement made along Middleton Wash. Discussed with Darryl on 9-6-05 09/26/2005 Corrections required per Jay Sandberg..As builts not completed--X-sections showing erosiion..protection to be submitted. Discussed with Darryl 9-23. 10/05/2005 Approved per Jay Sandberg. As-built corrected 8/4/06 - 1 year warranty inspection Approved per Ken B
Landscaping 09/08/2005 Corrections required per Ray Synder.. Street treees planted are Fruitless Mulberry and are not an approved street tree ordinance. Recommend planting approved trees between Mulberrys planted. City Forrester needs to review and evaluate Street trees.Install solid gates on trash enclouser and future reclaimed water enclosure. 09/21/2005 Approved per Ray S.,, Satisfy City Forrester with Correct spieces of streeet trees. 10/12/2005 Approved per Doug W. Tree's OK 8/4/06 - 1 year warranty inspection Approved per Ken B
    
General Comments: