| Drawing of Record Submitted | 01/09/2006 |
|---|---|
| Electronic Drawing | 01/09/2006 |
| Final Grading Report | 01/09/2006 |
| Date Scheduled | 01/12/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 01/12/2006 Approved per Dennis Wright Bldg F.& Club House Only 06/06/2006 Approved per Dennis Wright 12/5/06 1 year warranty Approved per Dennis Wright. 9/7/07 - 1 year warranty - Approved per Dennis Wright. |
| Water | 01/19/2006 Approved per Kevin Condie 2/27/07 1 year warranty - Corrections required per Kevin Condie. Checked locate wire all good 12/18/06. Need to raise valve and move hydrant closer to sidewalk. 11/07/2007 Approved per Tim Dotson.. 1 year warranty |
| Wastewater | 01/19/2006 Approved per Kevin Condie 2/27/07 1 year warranty - Corrections required per Kevin Condie. Checked locate wire all good 12/18/06. Need to raise valve and move hydrant closer to sidewalk. 11/07/2007 Approved per Tim Dotson.. 1 year warranty |
| Engineering | 01/12/2006 Approved per Larry Henderson Bldg "F" 10/26/06 Approved per Brandon Wright (E) 1/22/07 - 1 year warranty - Approved per Brandon Wright. 9/11/2007 1 yr warranty.. Correctiosn required per Brandon Wright..Broken sidewalk on Plantations Drive, cut pipe on Plantations Dr storm drain grout around pipe also, erosion on road needs to be removed. |
| City Development Engineer | 01/18/2006 Corrections required per Wes Jenkins..1. Plantaiotns Drive-Finish curb, gutter, sidewalk,asphalt paving,median curb. and water and power stubs to median. 2. 1790 West- finish curb,gutter,sidewalk,asphalt paving and storm drainage. 3. Finish on site paving. 01/19/2006 Approved Per Wes Jenkins.. Building 1 and Clubhouse only as shown on approved construction 12/26/2006 Corrections required per Ken Bricker..1 year warranty,, End of road markers are required at the bottom of the Hill (or) left turn arrow. Also missing a street name sign. 9/10/07 - 1 year warranty - approved per Ken B. |
| Landscaping | 01/25/2006 Corrections required per Ray Synder.. NOTE: Phase 2 includes buildings 1-2-& 3, also Clubhouse and Mech bldg, also Plantations Drive. As of 1-25-06 Bldg 1 is completed only. other bldg under const. Landscaping is not complete. Plantaion Drive is not complete. 12/26/2006 Corrections required per Ken Bricker.. 1 year warranty..Brush needs removed from sidewalks,gravel on sidewalks and trash in storm drain inlet. 9/10/07 - 1 year warranty - approved per Ken B. |
| General Comments: | |