Drawing of Record Submitted |
01/09/2006 |
Electronic Drawing |
01/09/2006 |
Final Grading Report |
01/09/2006 |
Date Scheduled |
01/12/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
01/12/2006 Approved per Dennis Wright Bldg F.& Club House Only
06/06/2006 Approved per Dennis Wright
12/5/06 1 year warranty Approved per Dennis Wright.
9/7/07 - 1 year warranty - Approved per Dennis Wright. |
Water |
01/19/2006 Approved per Kevin Condie
2/27/07 1 year warranty - Corrections required per Kevin Condie. Checked locate wire all good 12/18/06. Need to raise valve and move hydrant closer to sidewalk.
11/07/2007 Approved per Tim Dotson.. 1 year warranty |
Wastewater |
01/19/2006 Approved per Kevin Condie
2/27/07 1 year warranty - Corrections required per Kevin Condie. Checked locate wire all good 12/18/06. Need to raise valve and move hydrant closer to sidewalk.
11/07/2007 Approved per Tim Dotson.. 1 year warranty |
Engineering |
01/12/2006 Approved per Larry Henderson
Bldg "F"
10/26/06 Approved per Brandon Wright (E)
1/22/07 - 1 year warranty - Approved per Brandon Wright.
9/11/2007 1 yr warranty.. Correctiosn required per Brandon Wright..Broken sidewalk on Plantations Drive, cut pipe on Plantations Dr storm drain grout around pipe also, erosion on road needs to be removed. |
City Development Engineer |
01/18/2006 Corrections required per Wes Jenkins..1. Plantaiotns Drive-Finish curb, gutter, sidewalk,asphalt paving,median curb. and water and power stubs to median. 2. 1790 West- finish curb,gutter,sidewalk,asphalt paving and storm drainage. 3. Finish on site paving.
01/19/2006 Approved Per Wes Jenkins.. Building 1 and Clubhouse only as shown on approved construction
12/26/2006 Corrections required per Ken Bricker..1 year warranty,, End of road markers are required at the bottom of the Hill (or) left turn arrow. Also missing a street name sign.
9/10/07 - 1 year warranty - approved per Ken B. |
Landscaping |
01/25/2006 Corrections required per Ray Synder.. NOTE: Phase 2 includes buildings 1-2-& 3, also Clubhouse and Mech bldg, also Plantations Drive. As of 1-25-06 Bldg 1 is completed only. other bldg under const. Landscaping is not complete. Plantaion Drive is not complete.
12/26/2006 Corrections required per Ken Bricker.. 1 year warranty..Brush needs removed from sidewalks,gravel on sidewalks and trash in storm drain inlet.
9/10/07 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|