Drawing of Record Submitted |
05/13/2005 |
Electronic Drawing |
05/13/2005 |
Final Grading Report |
05/13/2005 |
Date Scheduled |
05/17/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
05/17/2005 Approved per Dennis Wright |
Water |
05/18/2005 Corrections required per Kevin Condie.. Size of lines need to be put into valve collars, Record of Drawing is not right. Test backflow on sprinklers.
05/19/2025 Corrections required per Kevin Condie.. Need record of Drawing
06/14/2005 Approved per Kevin Condie |
Wastewater |
05/18/2005 Corrections required per Kevin Condie.. Size of lines need to be put into valve collars, Record of Drawing is not right. Test backflow on sprinklers.
05/19/2025 Corrections required per Kevin Condie.. Need record of Drawing
06/14/2005 Approved per Kevin Condie |
Engineering |
05/16/2005 Approved Larry Henderson |
City Development Engineer |
05/19/2005 Apporved per Cathy H. Electronic Dwg of record-- 5-13 DWG ok |
Landscaping |
05/13/2005 Approved per Ray Sydner |
| |
General Comments: |
|