| Drawing of Record Submitted | 05/13/2005 |
|---|---|
| Electronic Drawing | 05/13/2005 |
| Final Grading Report | 05/13/2005 |
| Date Scheduled | 05/17/2005 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 05/17/2005 Approved per Dennis Wright |
| Water | 05/18/2005 Corrections required per Kevin Condie.. Size of lines need to be put into valve collars, Record of Drawing is not right. Test backflow on sprinklers. 05/19/2025 Corrections required per Kevin Condie.. Need record of Drawing 06/14/2005 Approved per Kevin Condie |
| Wastewater | 05/18/2005 Corrections required per Kevin Condie.. Size of lines need to be put into valve collars, Record of Drawing is not right. Test backflow on sprinklers. 05/19/2025 Corrections required per Kevin Condie.. Need record of Drawing 06/14/2005 Approved per Kevin Condie |
| Engineering | 05/16/2005 Approved Larry Henderson |
| City Development Engineer | 05/19/2005 Apporved per Cathy H. Electronic Dwg of record-- 5-13 DWG ok |
| Landscaping | 05/13/2005 Approved per Ray Sydner |
| General Comments: | |