Drawing of Record Submitted |
01/06/06 |
Electronic Drawing |
01/06/06 |
Final Grading Report |
01/06/06 |
Date Scheduled |
01/12/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
10/21/2005 Approved per Kevin Condie |
Wastewater |
10/21/2005 Approved per Kevin Condie |
Engineering |
10/21/2005 Approved per Larry Henderson |
City Development Engineer |
10/18/2005 Approved per Jay Sandberg.. For Permits Only For Lots (#1282..#1284..#1285 only)
11/10/2005 Permits only for lots #1279,1281,1283,1284,1285,1253 |
Landscaping |
10/19/2005 Approved per Mark Bradley N/A |
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
01/12/2006 Corrections required per Kevin Condie.. 1. People parked cars on meter boxes,dirt on them to and lumber on meter boxes.2. Cars parked on valve for hydrants and dirt on valves. 3. Valve in Angel Arch need to be poured w/concrete collar. 4. Meter collar are broken on new homes. 5. Hydrant valve at end of Angel Arch need to be raised and phase line valve to, 6. Need to check wire. 7. Need to flush hydrants 8. Center setter in meter box
02/07/2006 Corrections required per Tim D.. Need to make some corrections marking boxes and valves
02/21/2006 Approved per Tim D.
12/05/2007 Approved per Darrin Judd.. Wire ok for 1 yr warranty
12/05/2007 Approved per Darrin Judd.. 1 yr warranty.. |
Wastewater |
01/12/2006 Corrections required per Kevin Condie.. 1. People parked cars on meter boxes,dirt on them to and lumber on meter boxes.2. Cars parked on valve for hydrants and dirt on valves. 3. Valve in Angel Arch need to be poured w/concrete collar. 4. Meter collar are broken on new homes. 5. Hydrant valve at end of Angel Arch need to be raised and phase line valve to, 6. Need to check wire. 7. Need to flush hydrants 8. Center setter in meter box
02/07/2006 Corrections required per Tim D.. Need to make some corrections marking boxes and valves
02/21/2006 Approved per Tim D.
12/05/2007 Approved per Darrin Judd.. Wire ok for 1 yr warranty
12/05/2007 Approved per Darrin Judd.. 1 yr warranty.. |
Engineering |
01/11/2006 Corrections required per Larry Henderson.. Collars on Angel Arch,backfill behind curb on Angel Arch,street lights on Angel Arch and interior, ramp end of sidewalks, rockwall certifications,seal cracks in curbs, complete sidewalks in interior, clean out inlet boxes, remove landscape materials, block and dumpsters from Angel Arch.
01/27/2006 Approved per Larry Henderson
1/17/2008 Approved per Carlos Robles 1 yr warranty |
City Development Engineer |
11/22/2005 Approved per Jay Sandberg
01/11/2006 Approved per Jay Sandberg.
4/18/07 1 year warranty approved per Ken B. |
Landscaping |
01/13/2006 Corrections required per Mark Bradley.. Install landscape and street trees along Angel Arch Drive. City Foreste to inspect trees.
01/25/2006 Corrections required per Doug W. (TH)No landscaping
02/02/2006 Approved per Mark Bradley.. NOTE: City Forester is required to approve street trees.
05/04/2006 Approved per Doug W.
4/18/07 1 year warranty approved per Ken B. |
| |
General Comments: |
|